GC0176: Introduction of Demand Control Rotation Protocol within Operating Code 6 of the Grid Code

The modification will make changes to OC6 to allow for the Demand Control Rotation Protocol (DCRP) to be formally recognised as a tool to manage shortfalls in electricity supply for short term use.

Modification status:
Current - Code Administrator Consultation
Last updated:
03 December 2025

Code Administrator Contact: [email protected]

Proposed Governance Route: Standard Governance modification with assessment by a Workgroup

High Impact: on ​​Network Operators, National Energy System Operator and Consumers

Code modification proposed by:
Frank Kasibante