CMP466: CMP456 Consequential Charging Modification

This modification is required to facilitate the implementation of CMP456. In discussions with the National Energy System Operator (NESO) it has become clear that a small change to the Balancing Services Use of System (BSUoS) within Section 14 ‘Charging Methodologies’ will be required to ensure that any validated costs arising via the CMP456 solution are recovered, as happens today with black start costs, via BSUoS.

Modification status:
Current - Proposal Raised
Last updated:
04 December 2025

Code Administrator Contact: [email protected]

Proposed Governance Route: Urgent modification to proceed under a timetable agreed by the Authority (with an Authority decision)

Medium impact on: Generators and the System Operator

Code modification proposed by:
Tim Ellingham