GSR036: System Access Reform: Review of the voltage limits

This modification is to review the voltage limits applicable to operational timescales and the potential for provision of some flexibility around them.

Modification status:
Current - Proposal Raised
Last updated:
10 December 2025

Code Administrator Contact: [email protected]

 

Governance Route:  Standard Governance modification to proceed to Code Administrator Consultation.

 

Impacts Medium impact ​​on Transmission Owners (TOs), Transmission System Operator (NESO), Distribution Network Owners (DNOs), Directly Connected Customers (DCCs), Offshore Transmission Owners (OFTOs), Interconnectors and Generators.

Code modification proposed by:
Dozie Nnabuife

Documents