Grid Code (GC)

The Grid Code has the technical rules for connecting to and using the National Electricity Transmission System (NETS). Following the Grid Code is required by the Connection and Use of System Code (CUSC).

As the code administrator for the Grid Code, we manage and update the Grid Code. All changes must be reviewed by the Grid Code Review Panel, and approved by the panel or Ofgem.

If you're interested in connecting to the NETS, find out more about the connections process.