CMP425: Billing Demand Transmission Residual By Site

This modification is to provide clarity within the CUSC on how the residual demand charges should be divided between multiple Suppliers at one Connection Site.

Modification status:
Implemented - CMP425: Billing Demand Transmission Residual By Site
Last updated:
30 May 2025

Code Administrator Contact: Milly Lewis - [email protected]

Proposed Governance Route: Urgency 

Impacts: High Impact to parties on demand sites with multiple TO points that may wish to have separate Suppliers and a Low impact on ESO’s billing.

Code modification proposed by:
Andy Marsh

Documents