Search results
Filter by
Datasets (112)
- CSV
Interconnectors
These are the values submitted by NESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…,…
- CSV
Ancillary services
The NG ESO publishes non-BM instruction data from our ASDP system once instructions have been confirmed by Service Providers. This information is then continuously published throughout the day on…
- CSV
Trading
National Grid ESO procures balancing service contracts to balance demand and supply and to ensure the security and quality of electricity supply across Britain's transmission system. For some of…
- CSV
Generation
OPMR is the amount of generation exceeding the demand forecast needed to meet our reserve requirement. When assessing and publishing generation availability information against system requirements,…
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatt (MW) at a generator level at a weekly resolution for 2-52 weeks ahead.
- CSV
Trading
This dataset displays all upcoming electricity trades due to be delivered. To meet our forecast balancing requirements at minimum cost, we trade energy-related products. The data is refreshed every…
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatts (MW) at a daily resolution for 2-14 days ahead.
- CSV
Interconnectors
These are the values submitted by NESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…,…
- CSV
- DOC
Generation
Electricity System Operator (ESO) publishes at a half-hourly resolution the embedded (refer to embedded document for definition) wind and solar forecast from within day up to 14 days ahead. This…
- CSV
Interconnectors
These are the values submitted by NESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…,…